You are not logged in.

  • "Passionsbus57" started this thread

Date of registration: Dec 8th 2011

Location: Metz / France

  • Send private message

21

Tuesday, June 26th 2012, 6:56pm

Hi everyone,

I proclaim to you good and bad news. Well, not too bad.

No I will not abandon my project of creating a line of Metz. But yes, the line 13 is abandoned.

Everything will change in Metz! And yes! From September this year, shuttles pass TCRM network in suburban lines, some are assembled. September 2013 is the commissioning of the entire network "Le Met' " the new network name of urban transit Metz and it will be the commissioning of two lines of BHNS (Bus network Mettis (Line A and B). And therefore, I decided to made ​​the two lines A and B network Mettis. So this is a big project and so far a small problem is that vehicles are in operation on this line, are bi-articulated Van Hool Exquicity 24. Currently no bi-articulated exists for OMSI and was still struggling to make articulated. So at first, and then standards will be articulated and if it comes out, the bi-articulated.

If you want to get some information about the network Mettis: http://mettis.metzmetropole.fr/

;)
https://sites.google.com/site/passionsbus57lesite/
http://aussiex.org/anybus/omnibus/signatures/image_render.php?reg=PB57&nickname=Passionsbus57
Project Map: Network TCRM - Line 13
http://www.omnibussimulator.de/forum/index.php?page=Thread&threadID=4643